01-26-2021, 10:19 PM
Hello there,
I'm trying to sync my Pocket Operators from the clock out on the NDLR. I read tangentially on another thread a comment from Jesse that he tried to sync with PO and it worked fine. I, however, must be doing something wrong.
I have the PPQ set to 4 (as Jesse he said the PO wants) and the PO set to SY2 (as illlustrated in the PO manual), but nothing happens. It just freezes on a step and won't progress any further.
I've tried various clock out divisions but that doesn't seem to alter the situation. The NDLR is playing, and the PO is obviously receiving something, but it is stalled. I'll go through the sync options (1-5) and it'll play on Sy1, then stop on whatever step its on when I go to sy2.
The NDLR is playing when I'm doing this. Am I missing another step on the NDLR? Or the PO?
Thanks!
Steve
I'm trying to sync my Pocket Operators from the clock out on the NDLR. I read tangentially on another thread a comment from Jesse that he tried to sync with PO and it worked fine. I, however, must be doing something wrong.
I have the PPQ set to 4 (as Jesse he said the PO wants) and the PO set to SY2 (as illlustrated in the PO manual), but nothing happens. It just freezes on a step and won't progress any further.
I've tried various clock out divisions but that doesn't seem to alter the situation. The NDLR is playing, and the PO is obviously receiving something, but it is stalled. I'll go through the sync options (1-5) and it'll play on Sy1, then stop on whatever step its on when I go to sy2.
The NDLR is playing when I'm doing this. Am I missing another step on the NDLR? Or the PO?
Thanks!
Steve